Does it fit the room?
Check width, depth, height, diagonal, extension, door opening, drawer opening, and full operating footprint.
Luzione Planning Library
Measure once. Buy once. A complete framework for room scale, circulation, delivery access, materials, budgeting, procurement, installation, and long-term ownership.
Contents
01 — Strategy
A piece should not be approved because it fits one wall. It must pass six tests before a high-value order is finalized.
Check width, depth, height, diagonal, extension, door opening, drawer opening, and full operating footprint.
Protect circulation, chair pull-back, drawer access, bed-making, cleaning, and everyday movement.
Compare visual mass, ceiling height, architecture, rug size, sightlines, and negative space.
Verify every gate, door, turn, elevator, stair, landing, and final placement angle.
Match fabric, stone, wood, leather, lacquer, and glass to pets, children, sunlight, humidity, and maintenance.
Include freight, tax, delivery, installation, storage, access fees, customization, and contingency.
02 — Room Survey
A useful survey records physical dimensions, fixed constraints, traffic patterns, light, electrical conditions, and the activities the room must support.
Overall dimensions, alcoves, recesses, slopes, ceiling beams, columns, and floor transitions.
Clear openings, swings, handles, trim, sill heights, curtains, and required operating space.
Outlets, switches, data, floor boxes, vents, radiators, fireplaces, and thermostats.
Main routes, seating patterns, entertaining, television, working, storage, and cleaning access.
Mark the complete footprint of each major piece. Include drawers, reclining mechanisms, dining-chair pull-back, and extended table leaves. Use the room normally for a day before approving the layout.
03 — Delivery Access
| Zone | Measure | Confirm | Risk |
|---|---|---|---|
| Street and curb | Truck length, parking, slope | Permits, loading hours, restrictions | Failed arrival or long carry |
| Gate and exterior path | Width, height, grade, turns | Landscaping and weather exposure | Damage or inability to turn |
| Entry door | Clear width, height, threshold | Door removal and hardware projection | Piece fits frame but not opening |
| Hallways | Width, height, length | Sconces, art, radiators, corners | Diagonal rotation failure |
| Stairs | Width, rise, headroom, landings | Railing and newel-post projection | Insufficient pivot space |
| Elevator | Door, cab width, depth, height | Booking, protection, weight capacity | Oversize or denied access |
| Final room | Door, approach, assembly area | Floor protection and placement | Fits home but not room entrance |
04 — Living Room
| Relationship | Planning range | Planning note |
|---|---|---|
| Main walkway | 36 in. preferred; 30 in. minimum | Use 42 in. where two people regularly pass. |
| Sofa to coffee table | 16–18 in. | Reachable without restricting knees. |
| Primary seating distance | 4–8 ft | Supports conversation without crowding. |
| Side table height | Within 2–3 in. of arm height | Improves usability. |
| Rug placement | Front legs minimum | Full placement often suits larger rooms. |
| Reclining clearance | Manufacturer specification | Include full motion and power-cord route. |
Seat depth, seat height, back height, arm thickness, base height, cushion compression, and total visual mass can matter more than overall width.
Use approximately 1.5–2.5 times the screen diagonal as a starting range, then adjust for screen resolution, viewing preference, eye height, and room layout. Confirm that low furniture does not block speakers, vents, or controls.
05 — Dining Room
| Relationship | Minimum | Preferred |
|---|---|---|
| Table edge to wall or cabinet | 36 in. | 42–48 in. |
| Width per diner | 24 in. | 28–30 in. |
| Chair pull-back | 24–30 in. | 30–36 in. |
| Walk behind seated guest | 36 in. | 42–48 in. |
| Rug beyond table | 24 in. | 30–36 in. |
| Fixture above table | 30–36 in. | Adjust for ceiling and sightlines |
Strong for square rooms, intimate groups, and easier movement around corners.
Useful in long rooms that need more seating without hard corners.
Works naturally with elongated rooms, larger groups, and architectural symmetry.
Effective in square rooms, though very large versions create a difficult center reach.
Measure the table closed and fully extended. Confirm leaf storage, chandelier position, full seating count, end-chair clearance, and whether service circulation still works.
06 — Bedroom
| Relationship | Minimum | Preferred |
|---|---|---|
| Bed side to wall | 24 in. | 30–36 in. |
| Foot of bed to wall | 30 in. | 36 in. or more |
| Foot of bed to dresser | 36 in. | 42 in. with open drawers |
| Visible rug beside bed | 18 in. | 24–30 in. |
| Bench depth | 18–24 in. | Only when foot clearance remains |
Record open drawer and door depth. For wardrobes, confirm ceiling clearance for assembly, door swing, internal drawer access, ventilation, and anchoring.
07 — Home Office
| Relationship | Range | Purpose |
|---|---|---|
| Behind desk chair | 36–42 in. | Roll back and stand. |
| Guest chair to desk | 30–36 in. | Entry and conversation. |
| Desk depth | 24–36 in. | Depends on monitors and work type. |
| Bookcase access | 30–36 in. | Browsing and door clearance. |
08 — Rugs
At least the front legs of all primary seating should rest on the rug. In generous rooms, placing the full seating group on the rug creates greater cohesion.
Allow at least 24 inches beyond the table on all sides, preferably 30–36 inches for wider or armed chairs. The chair should remain on the rug when pulled back.
Provide a useful visible border at both sides and the foot. A 9 × 12 rug is a common king-bed starting point, but room size, nightstands, and bench placement determine the final size.
09 — Lighting
A common starting height is 30–36 inches from tabletop to the fixture's lowest point. Adjust for ceiling height, fixture size, seated sightlines, and whether the table extends.
A dining fixture often feels balanced at roughly one-half to two-thirds of the table width. Long tables may require a linear fixture or repeated pendants.
10 — Materials
Review sealing, etching, staining, fissures, sample variation, weight, and edge vulnerability.
Control direct sun, standing moisture, heat sources, and severe humidity changes.
Understand aniline protection, scratches, oils, sunlight, and cleaning limitations.
Check abrasion, pilling, snagging, stain treatment, cleaning codes, and replacement availability.
Review scratch risk, fingerprints, heat, impact, cleaning method, and touch-up process.
Confirm tempering, weight, fingerprints, oxidation, finish repair, and replacement logistics.
11 — Budget
Retail price is only one part of the investment. A credible budget includes logistics, installation, risk, and the cost of finishing the room coherently.
| Category | Planning share | Notes |
|---|---|---|
| Primary upholstery or bed | 28–42% | Comfort, use, and visual scale. |
| Primary tables or storage | 14–24% | Functional structure and material presence. |
| Rug | 8–18% | Scale, softness, and cohesion. |
| Lighting | 8–18% | Atmosphere, focal point, and installation. |
| Secondary furniture | 10–18% | Completes use and conversation. |
| Objects, art, and styling | 5–12% | Identity after the room is structurally resolved. |
| Freight, delivery, installation | 8–18% | Varies sharply by access and origin. |
| Contingency | 5–10% | Storage, access, modification, and unexpected work. |
12 — Procurement
| Track | Why |
|---|---|
| Product, finish, size, and quantity | Prevents specification drift. |
| Approval date and deposit | Establishes the commercial milestone. |
| Production estimate | Supports schedule planning. |
| Ready-to-ship date | Coordinates final payment and freight. |
| Freight status | Separates production delay from transportation delay. |
| Site-ready date | Prevents premature delivery and storage. |
| Installation dependencies | Coordinates electrical, wall, floor, and access preparation. |
Work backward from the required installation date. Include specification approval, sample approval, production, quality control, freight, customs, local delivery, building reservation, and installation. Add schedule buffer for custom or imported items.
13 — Installation
14 — Ownership
Dust, rotate loose cushions, remove spills promptly, and inspect high-contact surfaces.
Check hardware, leveling, connectors, sunlight exposure, leather condition, and rug rotation.
Deep clean suitable textiles, inspect stone sealing, tighten hardware, and review wall anchors.
Retain original packaging details and use professional movers for stone, glass, lacquer, and oversized pieces.
15 — Risk Prevention